Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution
Application area

Shanghai industrial boilers provide a one to one solution for different industry attributes and needs of customer enterprises.



Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 狼人综合在线 | 天堂国产一区二区三区四区不卡 | 免费看少妇高潮A片特黄 | 伊人综合网| 国产精品人妻无码久久网站 | xxxx免费麻豆成人无码区免 | 一区二区韩国福利网站 | 麻豆精品在线播放 | 一本色道久久综合狠狠躁篇 | 国产午夜一级鲁丝片 | 人妻无码久久精品人妻成人 | h污小舞白丝玉足榨精小说 h无码动漫无遮挡在线观看免费 | 亚洲欧美色综合影院 | 99久久久国产精品尤物免费 | 久久久久久久久久久亚洲精品 | 国产一区二区美女自慰 | 无码免费人妻A片AAA毛 | 精品国产aⅴ一区二区三区v免费 | 成人无码电影在线 | 日韩一区二区无码四区 | 久久久久青草线蕉综合 | 极品少妇被后入内射视 | 精品熟女少妇a免费久久 | 熟女人妻精品一区二区三 | 在线播放免费播放av片 | 天美传媒剧国产MV在线 | 91麻豆成人精品国产免费网站 | 国产激情视频一区二区三区 | 狠狠色噜噜狠狠狠888米奇 | 少妇做爰特黄A片免费看9588 | 久久精品视频6 | 精品无码特级毛片 | 国产成人av无码片在线观看 | 美女狠狠干 | 久久国产精品亚洲欧美日韩 | 国产裸拍裸体视频 | 亚洲av色福利天堂 | 国产经典自拍一区 | 女人天堂一区二区三区 | 亚洲欧美日韩中文播放 | av免费网址|